Base Project: Proposition 3 Work Items

Bell Top Elementary School

Site sanitary system investigation and replacement as needed
$156,960
Replace ceilings containing asbestos, associated lighting & vinyl asbestos tile flooring in those rooms
288,159
Replace deep dip in main driveway with culvert pipe at road
58,075
Upgrade/replace energy management system
276,642
Ramp to main public entry
98,100
Remove lead paint from Cafetorium siding & supports; reclad
80,180
Remove front entrance lead paint, repair & repaint
18,574
Replace exterior steel doors
47,088
Hot water heater replacement
50,000
Security office - vestibule connection
37,733
Bell Top Proposition # 3 Total:
$1,111,511

Buildings and Grounds Workshop

Provide tool room exhaust, ventilation for office and break room.
$7,848
Buildings and Grounds Proposition #3 Total:
$7,848

Columbia High School

Add security cameras, wiring, etc.
$130,800
Provide secure main entry vestibule for signing/buzzing in
261,600
Columbia High School Proposition # 3 Total:
$392,400

Donald P. Sutherland Elementary School

Site sanitary system investigation and replacement as needed
$196,200
Replace PCB ballast lighting, replace selected associated ceilings
75,435
Replace vinyl asbestos tile flooring
149,603
Upgrade/replace energy management system, exhaust fan controls
288,414
Resurface and/or replace pavement in bus loop/driveways
90,000
Security office - vestibule connection
32,295
Donald P. Sutherland Elementary School Proposition # 3 Total:
$831,947

Genet Elementary School

Replace PCB ballast lighting, replace selected associated ceilings
$640,055
Emergency generator for District-wide computer server system
130,800
Replace steam boilers with hot water boilers.
196,200
Replace original steam and condensate piping systems.
752,100
Replace original air handling equipment at cafeteria, gym and auditorium
523,200
Replace original pneumatic control components with energy management system; upgrade exhaust system controls
694,548
Replace 20+ year old membrane roofing
977,861
Security office - vestibule connection
61,522
Genet Elementary School Proposition # 3 Total:
$3,976,286

Goff Middle School

Replace PCB ballast lighting, selected associated ceilings
$250,000
Replace sidewalks
107,910
Security office - vestibule connection
103,598
Goff Middle School Proposition # 3 Total:
$461,508

Green Meadow Elementary School

Site sanitary system investigation and replacement as needed
$156,960
Replace deteriorated storm catch basins and portions of storm piping system
261,600
Upgrade/replace energy management system
400,248
Replace wood ramps and railing systems
37,670
Security office - vestibule connection
116,918
Green Meadow Elementary School Proposition # 3 Total:
$973,396

Red Mill Elementary School

Replace ceiling tiles adhered to asbestos containing plaster
$102,547
Replace PCB ballast lighting, replace selected associated ceilings
479,637
Replace deteriorated storm catch basins and portions of storm piping system
235,440
Regrade parking areas that currently pond and replace pavement
150,000
Upgrade/replace HVAC control system, exhaust fan controls
471,469
Security office - vestibule connection
46,863
Red Mill Elementary School Proposition # 3 Total:
$1,485,956

Transportation Center

Replace wash bay equipment
$206,664
Replace two in-ground lifts
392,400
Increase size of snow guards and provide passage door protection roofs.
24,852
Transportation Center Proposition # 3 Total:
$623,916